Ceiling Board Calculator: boards, battens, cornice and insulation
Enter the ceiling area and the distance around the room, choose your board, cornice and insulation, and the calculator lists the boards with everything needed to put them up: battens, screws, nails, jointing material, cornice and its adhesive, insulation and the paint.
The calculator is free and works for a building job anywhere in South Africa. The fields for this page are marked in the calculator below; the sums behind it and a worked example follow underneath.
For a ceiling: fill in Ceiling Area and Ceiling Perimeter (and Soffits if you have them), choose the Ceiling Board, Insulation and Cornice Style under Options, then press Generate Quote.
How the quantity is worked out
- Boards: Rhino Board and Nutec board come in 1.2 m × 3 m sheets, which is 3.6 m² each. The ceiling area is divided by 3.6 and rounded up to whole sheets. PVC ceiling and Isoboard are listed in square metres.
- Battens: 38 × 38 mm battens are allowed at 300 mm spacing with 10% extra, and listed in 6 m lengths.
- For Rhino Board the calculator adds skimming plaster and fibre tape for the joints.
- Cornice comes in 2 m lengths, so the perimeter is divided by 2. No cornice is added if you leave the perimeter on 0.
- Insulation rolls are the ceiling area divided by the area one roll of the chosen thickness covers.
- Soffits are worked out from their length and a 0.3 m overhang, in Nutec board.
- If you leave Ceiling Area on 0 the calculator uses the Floor Area instead.
The figures the calculator uses
| Item | Allowance |
|---|---|
| Rhino Board 6.4 mm or Nutec board 4 mm (1.2 m × 3 m) | Ceiling area ÷ 3.6, rounded up to whole sheets |
| PVC ceiling 250 mm, Isoboard 30, 40 or 50 mm | Listed in m² - the same as the ceiling area |
| Battens 38 × 38 mm | 300 mm spacing plus 10%: about 3.7 m of batten per m², in 6 m lengths |
| Skimming plaster 40 kg (Rhino Board only) | 1 bag per 12 m² |
| Fibre tape 50 mm (Rhino Board only) | 1 roll per 10 m² |
| Screws | 11 per m² |
| Wire nails 75 mm | 0.07 kg per m² |
| Cornice (2 m lengths) | Perimeter ÷ 2 |
| Cornice adhesive (280 ml tubes) | 1 tube per 20 m of cornice |
| Ceiling paint | Primer: area ÷ 4 × 2 litres. Topcoat: area ÷ 4.4 × 2 litres. Both in 20 litre drums |
Worked example: a 6 m × 8 m ceiling
A 48 m² ceiling with 28 m of perimeter, in Rhino Board with cornice.
- Boards: 48 ÷ 3.6 = 13.3, rounded up to 14 sheets.
- Battens: 48 ÷ 0.3 × 1.1 = 176 m, which is 30 lengths of 6 m.
- Skimming plaster: 48 ÷ 12 = 4 bags. Fibre tape: 48 ÷ 10 = 4.8, rounded up to 5 rolls.
- Screws: 48 × 11 = 528. Wire nails: 48 × 0.07 = 3.4, rounded up to 4 kg.
- Cornice: 28 ÷ 2 = 14 lengths, with 2 tubes of adhesive.
In PVC ceiling instead of Rhino Board, the same room is listed as 48 m² of PVC with the same 30 battens, and no skimming plaster or tape.
How to measure
- Ceiling area: multiply the length by the width of each room, wall to wall, and add the rooms together.
- Perimeter: add up the length of all the walls around each ceiling. This is the length of cornice you need.
- Soffits: measure the total length of roof overhang that must be closed in, in metres.
- Note which way the boards will run in each room. Sheets are 3 m long, so room sizes that are not multiples of 1.2 m and 3 m mean more cutting.
Common mistakes
- Expecting a waste allowance. The board count is only rounded up to whole sheets; add sheets for odd-shaped rooms and offcuts you cannot reuse.
- Working out the whole house as one big area when it is many small rooms. Small rooms waste more board than one open space.
- Leaving the perimeter on 0 and then missing the cornice.
- Assuming the batten spacing suits every board. The calculator always uses 300 mm; check the board maker's fixing guide for the spacing your board needs.
- Forgetting the trapdoor, and the insulation thickness your plans call for.
From your list to a quote
- Fill in your measurements and press Generate Quote. The list appears under the calculator, section by section, with product codes, quantities and HPM's prices.
- Send on WhatsApp opens a WhatsApp message to HPM (076 370 4367) with your list in it. You do not need an account.
- Submit Quote sends the list to HPM as a quote request and gives you a quote number. Fill in your name and phone number or email first, so that we can answer you. Online quote requests can only be sent from inside South Africa.
- Print / PDF prints the list or saves it as a PDF.
- Signed in to your HPM account? Save to my Bou-lys keeps the list as a material list that you can turn into a quote or an order later.
Rather talk to someone? Call 028 435 6331 or WhatsApp 076 370 4367.
Prices and delivery: what applies where
- The quantities work anywhere in South Africa. They come from your measurements only.
- The prices are HPM's own. The quote shows our prices excluding VAT, adds VAT at the bottom, and is subject to stock availability. The cement options are priced for collection in store or delivery in Struisbaai, L'Agulhas and Suiderstrand.
- Not every line has a price. Sand, stone and a few other items are listed with their quantity only - HPM prices them when you ask for a quote. Delivery is not included in the total.
- Heavy materials are not couriered. Bricks, blocks, cement, pavers, sand, stone, full-size boards and timber lengths go on HPM's own trucks in the Western Cape only, or you collect them at the store in Struisbaai. See delivery across South Africa.
- Building somewhere else in South Africa? Use the quantities and buy the heavy materials from a supplier near you. Lighter items in parcels up to 50 kg can be sent by courier from our online store anywhere in the country.
Shop the materials
- Roof & ceiling - Cornices and other roof and ceiling products.
- Insulation & waterproofing - Insulation, damp-proofing and waterproofing products.
- Fasteners & adhesives - Screws, nails and adhesives - light items that can be couriered.
- Paint - Primers, wall and ceiling paint, fillers and painting accessories.
Ceiling Board Calculator questions
How many ceiling boards do I need?
Divide the ceiling area by the area of one board and round up. A 1.2 m × 3 m board covers 3.6 square metres, so a 48 square metre ceiling needs 48 ÷ 3.6 = 13.3, which is 14 boards before any extra for offcuts.
What size ceiling boards does the calculator use?
Rhino Board 6.4 mm and Nutec board 4 mm in 1.2 m × 3 m sheets. PVC ceiling 250 mm and Isoboard 30, 40 and 50 mm are listed by the square metre.
Does the ceiling calculator include waste?
Boards are rounded up to whole sheets but no extra is added for offcuts, so add a few sheets for rooms with odd shapes. The battens do include 10% extra.
How many battens do I need for a ceiling?
The calculator spaces 38 × 38 mm battens 300 mm apart and adds 10%, which comes to about 3.7 metres of batten per square metre of ceiling. A 48 square metre ceiling is listed with 30 battens of 6 m. Check the board maker's fixing guide for the spacing your board needs.
How much cornice do I need?
Measure right around the room and divide by the 2 m length of a cornice. A room with 28 m of perimeter needs 14 lengths, and the calculator adds one tube of cornice adhesive for every 20 m.
Can HPM deliver ceiling boards to me?
Full-size ceiling boards and 6 m battens are too long for a courier parcel. HPM delivers them on its own trucks in the Western Cape, or you can collect from the store in Struisbaai. Small items such as screws, tape and adhesive can be sent by courier anywhere in South Africa.
More calculators
- Brick Calculator - How many stock bricks, maxi bricks or cement blocks a wall needs, with the mortar cement, brick reinforcing and wall ties.
- Cement Calculator - How many 50 kg bags of cement a job needs for brickwork mortar, plaster, foundations, floor slabs, topping and paving.
- Concrete Calculator - Cubic metres of concrete for a floor slab or strip foundations, split into bags of cement and cubic metres of sand and stone.
- Paving Calculator - How many cement pavers an area needs, with the G5 sub-base, bedding sand and cement.
- Building Materials Calculator - everything on one page.
The calculator gives an estimate from fixed allowances. Check quantities against your approved plans, and follow your engineer's instructions for foundations, concrete and anything structural.