Mon-Fri: 7:30am - 5:15pm | Sat: 8:00am - 1:00pm

Cement goes into almost every part of a building job. Enter your walls, floor and paving and the calculator counts the 50 kg bags for each part separately: mortar, plaster, foundations, the floor slab, the topping and the paving.

The calculator is free and works for a building job anywhere in South Africa. The fields for this page are marked in the calculator below; the sums behind it and a worked example follow underneath.

Customer & Job Details
Measurements ▼

For cement: fill in the wall lengths and height, the Floor Area and the Paving Area that apply to your job, set Plastering to Yes or No, then press Generate Quote. Each section of the quote has its own cement line.

Structure
Ceiling & Soffits
Paving
Options
Add Custom Products (Barcode Lookup)

How the quantity is worked out

  • Every part of the job has its own cement factor. Brickwork and plaster are worked out per square metre of wall, concrete per cubic metre, and paving per square metre.
  • Wall area is wall length times wall height. Choosing Plastering: Yes adds the same amount of cement again for the plaster.
  • Concrete volume is area times thickness for the floor, and wall length times a standard footing size for the foundations.
  • Each section of the quote is rounded up to whole bags on its own, so add the cement lines together for your total.
  • All bags are 50 kg. The Cement Location option only changes the brand and the price, not the number of bags.

The figures the calculator uses

ItemAllowance
Brickwork mortar0.28 bags per m² of wall
Plaster (when Plastering is Yes)0.28 bags per m² of wall
Concrete for foundations and floor slabs7.7 bags per m³
Floor topping, 25 mm thick7.7 bags per m³ (about 0.19 bags per m² of floor)
Paving0.175 bags per m² of paving
Lime for plaster (25 kg bags)1 bag for every 5 bags of cement in the brickwork and plaster section
Bag size50 kg

Worked example: cement for a small house

30 m of double walls and 12 m of single walls, 2.7 m high and plastered, with a 36 m² floor slab 100 mm thick.

  1. Wall area: (30 + 12) × 2.7 = 113.4 m².
  2. Mortar: 113.4 × 0.28 = 31.75 bags. Plaster: another 31.75 bags. Together 63.5, rounded up to 64 bags.
  3. Foundation concrete: 6.825 m³ × 7.7 = 52.6, rounded up to 53 bags.
  4. Brickwork below floor level: 42 m × 0.19 m = 7.98 m² × 0.28 = 2.2, rounded up to 3 bags.
  5. Floor slab: 36 m² × 0.1 m = 3.6 m³ × 7.7 = 27.7, rounded up to 28 bags.
  6. Topping: 36 m² × 0.025 m = 0.9 m³ × 7.7 = 6.9, rounded up to 7 bags.

Total: 64 + 53 + 3 + 28 + 7 = 155 bags of 50 kg cement.

How to measure

  • Walls: add up the length of the double and the single walls separately, and use the height from floor to the top of the wall.
  • Floor: multiply the inside length by the inside width of each room and add the rooms together. Enter the slab thickness in millimetres.
  • Paving: multiply length by width of each paved area and add them together.
  • Leave a field on 0 if that part of the job does not apply, and it is left off the quote.

Common mistakes

  • Using these bag counts for a different mix. The figures are the calculator's fixed allowances; structural concrete must be mixed the way your engineer or the cement maker specifies.
  • Forgetting the plaster. Plastering roughly doubles the cement for the walls.
  • Leaving out the topping, the foundations or the brickwork below floor level when adding up by hand.
  • Buying all the cement on day one. Cement must be kept dry and off the ground, and it does not keep for long once it draws moisture - order it in stages for a long job.

From your list to a quote

  1. Fill in your measurements and press Generate Quote. The list appears under the calculator, section by section, with product codes, quantities and HPM's prices.
  2. Send on WhatsApp opens a WhatsApp message to HPM (076 370 4367) with your list in it. You do not need an account.
  3. Submit Quote sends the list to HPM as a quote request and gives you a quote number. Fill in your name and phone number or email first, so that we can answer you. Online quote requests can only be sent from inside South Africa.
  4. Print / PDF prints the list or saves it as a PDF.
  5. Signed in to your HPM account? Save to my Bou-lys keeps the list as a material list that you can turn into a quote or an order later.

Rather talk to someone? Call 028 435 6331 or WhatsApp 076 370 4367.

Prices and delivery: what applies where

  • The quantities work anywhere in South Africa. They come from your measurements only.
  • The prices are HPM's own. The quote shows our prices excluding VAT, adds VAT at the bottom, and is subject to stock availability. The cement options are priced for collection in store or delivery in Struisbaai, L'Agulhas and Suiderstrand.
  • Not every line has a price. Sand, stone and a few other items are listed with their quantity only - HPM prices them when you ask for a quote. Delivery is not included in the total.
  • Heavy materials are not couriered. Bricks, blocks, cement, pavers, sand, stone, full-size boards and timber lengths go on HPM's own trucks in the Western Cape only, or you collect them at the store in Struisbaai. See delivery across South Africa.
  • Building somewhere else in South Africa? Use the quantities and buy the heavy materials from a supplier near you. Lighter items in parcels up to 50 kg can be sent by courier from our online store anywhere in the country.

Shop the materials

Cement Calculator questions

How many bags of cement do I need per square metre of brick wall?

The calculator allows 0.28 bags of 50 kg cement per square metre of wall for the mortar, and another 0.28 bags per square metre if the wall is plastered. A 100 square metre wall therefore needs 28 bags to build and 56 bags to build and plaster.

How many bags of cement are in a cubic metre of concrete?

This calculator allows 7.7 bags of 50 kg cement for every cubic metre of concrete in foundations and floor slabs. The right mix for structural concrete depends on the strength your plans call for, so follow your engineer's or the cement maker's mix instructions.

How much cement do I need for a concrete floor slab?

Multiply the floor area by the slab thickness in metres to get cubic metres, then multiply by 7.7. A 36 square metre slab 100 mm thick is 3.6 cubic metres and needs 28 bags, plus 7 bags for a 25 mm topping.

What size cement bag does the calculator use?

50 kg bags of 42.5 strength cement. You can choose PPC or Alpine cement in the Cement Location option.

Why does the calculator ask for a cement location?

HPM prices cement by where it goes: collected in store, or delivered in Struisbaai, L'Agulhas or Suiderstrand. The option only changes the price and brand on your quote. The number of bags stays the same wherever you build.

Can HPM deliver cement to me?

They are heavy items, so they are not sent by courier. HPM delivers them on its own trucks in the Western Cape only, or you can collect from the store in Struisbaai. If you are building somewhere else in South Africa, the quantities from this calculator are still right - take the list to a supplier near you.

More calculators

  • Brick Calculator - How many stock bricks, maxi bricks or cement blocks a wall needs, with the mortar cement, brick reinforcing and wall ties.
  • Concrete Calculator - Cubic metres of concrete for a floor slab or strip foundations, split into bags of cement and cubic metres of sand and stone.
  • Ceiling Board Calculator - How many ceiling boards a room needs, with the battens, screws, jointing, cornice, insulation and ceiling paint.
  • Paving Calculator - How many cement pavers an area needs, with the G5 sub-base, bedding sand and cement.
  • Building Materials Calculator - everything on one page.

The calculator gives an estimate from fixed allowances. Check quantities against your approved plans, and follow your engineer's instructions for foundations, concrete and anything structural.