Enter a floor area and thickness for a slab, or your wall lengths for strip foundations, and the calculator works out the concrete volume and splits it into bags of cement and cubic metres of sand and stone. It adds the plastic underlay and mesh for the slab and the steel for the foundations.

The calculator is free and works for a building job anywhere in South Africa. The fields for this page are marked in the calculator below; the sums behind it and a worked example follow underneath.

Customer & Job Details
Measurements ▼

For a floor slab: fill in Floor Area and Floor Thickness. For strip foundations: fill in the Double and Single Wall Lengths. Then press Generate Quote.

Structure
Ceiling & Soffits
Paving
Options
Add Custom Products (Barcode Lookup)

How the quantity is worked out

  • Floor slab: floor area times slab thickness gives the volume in cubic metres. The thickness starts at 100 mm and can be set from 50 to 300 mm.
  • Strip foundations: the calculator allows a fixed footing size under every metre of wall - 0.1 m³ of concrete per metre of single wall (a 0.25 m by 0.4 m section) and 0.1875 m³ per metre of double wall (a 0.25 m by 0.75 m section).
  • Each cubic metre is then split into cement, sand and stone using fixed quantities.
  • A 25 mm cement-and-sand topping over the whole floor is added as its own section.
  • Sand and stone are listed in cubic metres without a price, because HPM supplies and prices them separately.

The figures the calculator uses

ItemAllowance
Cement7.7 bags of 50 kg per m³ of concrete
Sand0.62 m³ per m³ of concrete
Stone, floor slab0.67 m³ per m³ of concrete
Stone 19 mm, foundations0.71 m³ per m³ of concrete
Foundation concrete, single wall0.1 m³ per metre of wall
Foundation concrete, double wall0.1875 m³ per metre of wall
Topping25 mm thick: 7.7 bags of cement and 0.62 m³ of sand per m³
Damp-proof plastic under the slab (250 micron)3 m × 30 m rolls, 90 m² per roll
Mesh Ref 193 (2.4 m × 6 m sheets)1 sheet per 12 m² of floor
Foundation steel (bars)Y12: wall length × 2 ÷ 6. Y10: wall length × 1.5 ÷ 6
Binding wire0.25 kg per metre of wall

Worked example: a 6 m × 6 m floor slab

A 36 m² floor slab, 100 mm thick, with a 25 mm topping.

  1. Volume: 36 m² × 0.1 m = 3.6 m³ of concrete.
  2. Cement: 3.6 × 7.7 = 27.7, rounded up to 28 bags.
  3. Sand: 3.6 × 0.62 = 2.23 m³. Stone: 3.6 × 0.67 = 2.41 m³.
  4. Topping: 36 m² × 0.025 m = 0.9 m³, which needs 7 bags of cement and 0.56 m³ of sand.
  5. Under the slab: 1 roll of 250 micron plastic and 36 ÷ 12 = 3 sheets of mesh.

Total for the slab and topping: 35 bags of cement, 2.79 m³ of sand and 2.41 m³ of stone.

How to measure

  • Slab: measure the length and the width in metres and multiply them. Split an L-shaped floor into rectangles and add them up.
  • Thickness: enter it in millimetres. Use the thickness on your plan.
  • Foundations: enter the total length of the walls that stand on them, double and single walls separately.
  • Working by hand? Length × width × thickness, all in metres, gives cubic metres: 6 × 6 × 0.1 = 3.6 m³.

Common mistakes

  • Mixing up millimetres and metres. 100 mm is 0.1 m, not 1 m.
  • Treating the footing sizes as a design. They are the calculator's fixed allowances for estimating; the real size, depth and reinforcing of your foundations come from your approved plans or your engineer.
  • Forgetting that the ground is never perfectly level. A slab poured on uneven fill uses more concrete than the drawing says.
  • Being surprised by the ceiling on the quote. The calculator assumes a floor is a room, so it also lists a ceiling of the same area and its paint. Ignore those sections if your slab is outside.

From your list to a quote

  1. Fill in your measurements and press Generate Quote. The list appears under the calculator, section by section, with product codes, quantities and HPM's prices.
  2. Send on WhatsApp opens a WhatsApp message to HPM (076 370 4367) with your list in it. You do not need an account.
  3. Submit Quote sends the list to HPM as a quote request and gives you a quote number. Fill in your name and phone number or email first, so that we can answer you. Online quote requests can only be sent from inside South Africa.
  4. Print / PDF prints the list or saves it as a PDF.
  5. Signed in to your HPM account? Save to my Bou-lys keeps the list as a material list that you can turn into a quote or an order later.

Rather talk to someone? Call 028 435 6331 or WhatsApp 076 370 4367.

Prices and delivery: what applies where

  • The quantities work anywhere in South Africa. They come from your measurements only.
  • The prices are HPM's own. The quote shows our prices excluding VAT, adds VAT at the bottom, and is subject to stock availability. The cement options are priced for collection in store or delivery in Struisbaai, L'Agulhas and Suiderstrand.
  • Not every line has a price. Sand, stone and a few other items are listed with their quantity only - HPM prices them when you ask for a quote. Delivery is not included in the total.
  • Heavy materials are not couriered. Bricks, blocks, cement, pavers, sand, stone, full-size boards and timber lengths go on HPM's own trucks in the Western Cape only, or you collect them at the store in Struisbaai. See delivery across South Africa.
  • Building somewhere else in South Africa? Use the quantities and buy the heavy materials from a supplier near you. Lighter items in parcels up to 50 kg can be sent by courier from our online store anywhere in the country.

Shop the materials

Concrete Calculator questions

How do I work out cubic metres of concrete?

Multiply length by width by thickness, all in metres. A slab 6 m long, 6 m wide and 100 mm (0.1 m) thick is 6 × 6 × 0.1 = 3.6 cubic metres.

How much cement, sand and stone do I need for one cubic metre of concrete?

This calculator allows 7.7 bags of 50 kg cement, 0.62 cubic metres of sand and 0.67 cubic metres of stone for each cubic metre of floor slab concrete, and 0.71 cubic metres of 19 mm stone for foundations. Structural concrete must follow the mix your engineer specifies.

How thick should a concrete slab be?

The calculator starts at 100 mm and lets you enter anything from 50 to 300 mm. The right thickness depends on what the slab must carry and on the ground under it, so use the thickness on your approved plans or ask your engineer.

Why does my quote show a ceiling when I only entered a floor?

The calculator treats a floor area as a room and adds a ceiling of the same size, with its paint. If your slab is outdoors, simply ignore the ceiling and paint sections.

Why do sand and stone show no price?

Sand and stone are supplied separately, so the calculator lists the cubic metres you need without a price. Contact HPM on 028 435 6331 for the price and delivery.

Can HPM deliver cement, sand and stone to me?

They are heavy items, so they are not sent by courier. HPM delivers them on its own trucks in the Western Cape only, or you can collect from the store in Struisbaai. If you are building somewhere else in South Africa, the quantities from this calculator are still right - take the list to a supplier near you.

More calculators

  • Brick Calculator - How many stock bricks, maxi bricks or cement blocks a wall needs, with the mortar cement, brick reinforcing and wall ties.
  • Cement Calculator - How many 50 kg bags of cement a job needs for brickwork mortar, plaster, foundations, floor slabs, topping and paving.
  • Ceiling Board Calculator - How many ceiling boards a room needs, with the battens, screws, jointing, cornice, insulation and ceiling paint.
  • Paving Calculator - How many cement pavers an area needs, with the G5 sub-base, bedding sand and cement.
  • Building Materials Calculator - everything on one page.

The calculator gives an estimate from fixed allowances. Check quantities against your approved plans, and follow your engineer's instructions for foundations, concrete and anything structural.