Mon-Fri: 7:30am - 5:15pm | Sat: 8:00am - 1:00pm

Enter the area you want to pave and choose the paver. The calculator gives the number of pavers and the layers under them: the G5 sub-base, the bedding sand and the cement.

The calculator is free and works for a building job anywhere in South Africa. The fields for this page are marked in the calculator below; the sums behind it and a worked example follow underneath.

Customer & Job Details
Measurements ▼

For paving: fill in Paving Area, choose the Paver Type under Options, then press Generate Quote.

Structure
Ceiling & Soffits
Paving
Options
Add Custom Products (Barcode Lookup)

How the quantity is worked out

  • The paving area in square metres is multiplied by the number of pavers per square metre for the paver you chose, and rounded up.
  • Pavers are listed per 1000, so a quantity of 2 means 2 000 pavers.
  • The sub-base is a 150 mm layer of G5 material over the whole area, with 30% added because it is compacted.
  • The bedding sand is a 50 mm layer over the whole area.
  • No extra pavers are added for cutting or breakage.

The figures the calculator uses

ItemAllowance
50 mm cement bond paver (grey or charcoal)50 pavers per m²
60 mm interlocking paver (grey or charcoal)48 pavers per m²
80 mm interlocking paver (grey or charcoal)48 pavers per m²
G5 sub-baseArea × 0.15 m × 1.3 (0.195 m³ per m²)
Bedding sandArea × 0.05 m (0.05 m³ per m²)
Cement (50 kg bags)0.175 bags per m²

Worked example: a 5 m × 8 m driveway

40 m² of paving.

  1. 50 mm bond pavers: 40 × 50 = 2 000 pavers, shown on the quote as 2 per 1000.
  2. 60 mm or 80 mm interlocking pavers instead: 40 × 48 = 1 920 pavers, shown as 1.92 per 1000.
  3. G5 sub-base: 40 × 0.15 × 1.3 = 7.8 m³.
  4. Bedding sand: 40 × 0.05 = 2 m³.
  5. Cement: 40 × 0.175 = 7 bags.

The sub-base and sand are listed without a price because HPM supplies and prices them separately.

How to measure

  • Multiply the length by the width of the area in metres. Split an odd shape into rectangles and add them together.
  • For a triangle, multiply the two sides that meet at the square corner and halve the answer.
  • Measure paths and edging strips as well - narrow strips add up.
  • Add your own allowance for cutting: the more edges, curves and diagonal patterns, the more pavers are cut.

Common mistakes

  • Ordering the exact number. The calculator adds nothing for cutting and breakage, so add extra, and more for curved edges or patterns laid at an angle.
  • Using one paver count for every paver. Pavers per square metre depend on the paver's size: the calculator uses 50 for bond pavers and 48 for interlocking pavers.
  • Forgetting the edges. Kerbs or edge restraints that keep the paving from spreading are not part of the calculation.
  • Treating the sub-base as fixed. The calculator always allows 150 mm; soft ground or heavy vehicles may need more - ask your paving contractor.
  • Choosing a paver only on price. Paver thickness should suit the traffic it must carry; ask before you order for a driveway.

From your list to a quote

  1. Fill in your measurements and press Generate Quote. The list appears under the calculator, section by section, with product codes, quantities and HPM's prices.
  2. Send on WhatsApp opens a WhatsApp message to HPM (076 370 4367) with your list in it. You do not need an account.
  3. Submit Quote sends the list to HPM as a quote request and gives you a quote number. Fill in your name and phone number or email first, so that we can answer you. Online quote requests can only be sent from inside South Africa.
  4. Print / PDF prints the list or saves it as a PDF.
  5. Signed in to your HPM account? Save to my Bou-lys keeps the list as a material list that you can turn into a quote or an order later.

Rather talk to someone? Call 028 435 6331 or WhatsApp 076 370 4367.

Prices and delivery: what applies where

  • The quantities work anywhere in South Africa. They come from your measurements only.
  • The prices are HPM's own. The quote shows our prices excluding VAT, adds VAT at the bottom, and is subject to stock availability. The cement options are priced for collection in store or delivery in Struisbaai, L'Agulhas and Suiderstrand.
  • Not every line has a price. Sand, stone and a few other items are listed with their quantity only - HPM prices them when you ask for a quote. Delivery is not included in the total.
  • Heavy materials are not couriered. Bricks, blocks, cement, pavers, sand, stone, full-size boards and timber lengths go on HPM's own trucks in the Western Cape only, or you collect them at the store in Struisbaai. See delivery across South Africa.
  • Building somewhere else in South Africa? Use the quantities and buy the heavy materials from a supplier near you. Lighter items in parcels up to 50 kg can be sent by courier from our online store anywhere in the country.

Shop the materials

Paving Calculator questions

How many pavers do I need per square metre?

This calculator uses 50 pavers per square metre for 50 mm cement bond pavers and 48 per square metre for 60 mm and 80 mm interlocking pavers. Other pavers have their own sizes, so check the number per square metre for the paver you buy.

How many pavers do I need for 40 square metres?

40 square metres needs 40 × 50 = 2 000 bond pavers, or 40 × 48 = 1 920 interlocking pavers, before you add extra for cutting and breakage.

Does the paving calculator include extra for cutting and breakage?

No. It gives the exact number for the area. Add your own allowance - more if the paving has many edges, curves or a pattern laid at an angle.

What else do I need besides the pavers?

The calculator lists a compacted G5 sub-base 150 mm thick, 50 mm of bedding sand and cement at 0.175 bags per square metre. Kerbs or edge restraints are not included.

Which paver should I use for a driveway?

Paver thickness should suit the traffic. The calculator offers 50 mm bond pavers and thicker 60 mm and 80 mm interlocking pavers; ask HPM or your paving contractor which one suits the vehicles that will use your driveway.

Can HPM deliver pavers to me?

They are heavy items, so they are not sent by courier. HPM delivers them on its own trucks in the Western Cape only, or you can collect from the store in Struisbaai. If you are building somewhere else in South Africa, the quantities from this calculator are still right - take the list to a supplier near you.

More calculators

  • Brick Calculator - How many stock bricks, maxi bricks or cement blocks a wall needs, with the mortar cement, brick reinforcing and wall ties.
  • Cement Calculator - How many 50 kg bags of cement a job needs for brickwork mortar, plaster, foundations, floor slabs, topping and paving.
  • Concrete Calculator - Cubic metres of concrete for a floor slab or strip foundations, split into bags of cement and cubic metres of sand and stone.
  • Ceiling Board Calculator - How many ceiling boards a room needs, with the battens, screws, jointing, cornice, insulation and ceiling paint.
  • Building Materials Calculator - everything on one page.

The calculator gives an estimate from fixed allowances. Check quantities against your approved plans, and follow your engineer's instructions for foundations, concrete and anything structural.