By HPM Bouhandelaars · Updated · 6 min read · Walls, concrete and paving

In short

  • Paving is only as good as the base under it. Most sinking paving was laid on a poorly compacted base.
  • The layers, from the bottom: compacted ground, compacted sub-base, a thin bedding sand layer, pavers, jointing sand.
  • Edge restraints on every side stop the pavers creeping apart.
  • Build in a slight fall so that water runs away from the house.
  • Work out the area in square metres, divide by the area of one paver and add extra for cuts.

Pavers themselves almost never fail. What fails is the ground underneath: a year or two after the job, wheel ruts appear in the driveway, a hollow collects water by the back door and the edge along the lawn starts to drift apart. All three come from what was done, or not done, before the first paver went down. This guide explains the layers under paving, how to lay it, how to work out quantities and the mistakes to avoid.

The layers under good paving

Segmental paving - concrete or clay pavers laid on sand - is a system of layers, each with a job:

  1. Subgrade. The natural ground, with all topsoil, roots and soft material removed, shaped to the falls and compacted.
  2. Sub-base. A layer of crushed stone or other suitable gravel, placed and compacted in layers. It spreads the load. The thickness depends on the ground and on what will use the paving: a garden path on firm ground needs far less than a driveway on clay or loose sand.
  3. Bedding sand. A thin, even layer of clean, coarse sand - roughly 20 to 30 mm - screeded level and not compacted before laying. It is there to seat the pavers, not to fix levels. Thick bedding sand is a common cause of sinking.
  4. Pavers, laid tight in a pattern.
  5. Jointing sand. Fine, dry sand brushed into the joints, which locks the pavers together so that they act as one surface.

Around all of it runs the edge restraint: kerbs, a row of pavers bedded in concrete or a concrete haunch. Without it the outer pavers move sideways, the joints open and the whole surface loosens.

Choosing pavers

  • Thickness. Thicker pavers carry more load. Thin pavers (around 50 mm) are for paths, patios and other foot traffic; driveways need thicker pavers, and areas that carry trucks need thicker pavers still and an engineered base. HPM lists 50 mm cement pavers and an 80 mm interlocking paver in the online store.
  • Shape. Rectangular "bevel" pavers suit most domestic work. Interlocking shapes resist movement under turning wheels.
  • Pattern. Herringbone locks best and is the usual choice for driveways. Stretcher bond and basket weave are fine for paths and patios.
  • Colour. Order the whole job at once and mix pavers from several packs as you lay, so that small colour differences blend in.

Laying, step by step

  1. Plan the levels. The finished paving must slope gently so that water runs away from the house and off the surface - roughly 1 to 2 cm of fall for every metre is a common guide. Keep the finished level well below the damp-proof course of the house walls and below door thresholds.
  2. Set out with pegs and a builders line. Check for pipes and cables before you dig.
  3. Excavate to the total depth of sub-base, bedding sand and paver, removing all topsoil.
  4. Compact the subgrade, then place the sub-base in layers and compact each layer with a plate compactor. Dampen dry material slightly so that it binds. The finished sub-base should already follow the final falls.
  5. Build the edge restraints on at least two sides before laying, so that you have something firm to work from.
  6. Screed the bedding sand between guide rails with a straight edge. Do not walk on it afterwards.
  7. Lay the pavers from a straight edge or corner, working forward while standing on the pavers already laid. Keep the joints narrow and even, and check the lines every few rows.
  8. Cut the edge pieces with an angle grinder and diamond blade or a block splitter. Avoid slivers narrower than about a third of a paver. Wear eye, ear and dust protection.
  9. Compact the laid pavers with a plate compactor (use a rubber mat or pad under it on pavers that mark easily), then sweep dry jointing sand into the joints and compact again. Repeat until the joints stay full.

Working out quantities

Pavers. Measure the area in square metres (length x width; split odd shapes into rectangles and triangles). Divide one square metre by the face area of one paver to get the number per square metre: a 200 x 100 mm paver covers 0.02 m², so 50 per square metre. Multiply by the area and add about 5 to 10 percent for cuts and breakage - more for herringbone laid at 45 degrees and for curved edges. Check the paver size on the product page; pavers are also sold by the pack or pallet, with the number per pack stated.

Bedding sand and sub-base. Volume is area x thickness, with the thickness in metres. For 40 m² of paving with 25 mm of bedding sand: 40 x 0.025 = 1.0 m³. Sub-base is worked out the same way; allow extra because loose material shrinks when it is compacted.

Edges. Measure the total length of free edges for kerbs or haunching, and allow cement, sand and stone for the concrete. The building calculators can do the sums, and the cement guide covers the concrete mix.

Common mistakes

  • Laying on topsoil or uncompacted fill. Organic soil keeps settling. It has to come out.
  • Compacting once, in one thick layer. A plate compactor only reaches a limited depth, so thick fill must be compacted in layers.
  • Using bedding sand to fix levels. Hollows in the sub-base filled with extra sand turn into hollows in the paving.
  • No edge restraint, or one added afterwards on top of loose sand.
  • No fall, or a fall towards the house.
  • Trenches under the paving (for pipes or cables) backfilled without compaction - the classic sunken strip across a driveway.
  • Skipping the jointing sand or sweeping it in wet, so that the joints never fill.
  • Paving over the damp-proof course of the house, which causes rising damp inside. See damp-proofing basics.

Looking after paving

Top up jointing sand when joints look empty, especially in the first few months and after heavy rain. Deal with weeds while they are small; they root in the joint sand, not under the pavers. If a spot does settle, the fix is one of the advantages of pavers: lift the affected area, add and compact base material, re-screed the sand and relay the same pavers.

Pavers, kerbs, cement, sand and stone are heavy materials, delivered by HPM's own trucks in the Western Cape or collected in Struisbaai. For areas that will carry heavy vehicles, or for paving on steep slopes or poor ground, get an engineer's advice on the base.

What you need

These links open the matching products in the HPM online store, with live prices (incl. VAT) and stock.

Questions and answers

How do I lay paving that will not sink?

Remove topsoil, compact a proper sub-base (usually crushed stone) in layers, add a bedding sand layer, lay the pavers with edge restraints, then compact them and brush joint sand in. Most sinking paving was laid on a poorly compacted base.

How many pavers do I need per square metre?

Divide one square metre by the area of one paver. A 200 x 100 mm paver covers 0.02 square metres, so you need 50 per square metre. Check the size on the product page, then add extra for cuts and breakage.

Do I need cement under paving?

Not under the whole area in normal paving: pavers are bedded on sand over a compacted sub-base. Cement is used for the edge restraints - kerbs or a concrete haunch that hold the outer pavers in place.

What thickness of paver do I need for a driveway?

Thicker pavers carry more load. Thinner pavers are meant for paths and patios, while driveways need thicker pavers and a deeper sub-base. Tell us what will drive on the paving and we will recommend a paver; for heavy vehicles ask an engineer.

Does HPM deliver pavers?

Yes, with our own trucks in the Western Cape, or you can collect in Struisbaai. Pavers are heavy, so they do not go by courier. WhatsApp 076 370 4367 with the area and the town for a quote including delivery.

Delivery from HPM

Parcels up to 50 kg are delivered by courier anywhere in South Africa, with the rate shown at checkout. Heavy building materials such as cement, bricks, sand, stone and timber are delivered by our own trucks in the Western Cape, and any order can be collected free in Struisbaai.

WhatsApp 076 370 4367 for a quote, call 028 435 6331 or email [email protected].

General guidance only. Products, sites and building rules differ - always follow the product data sheet and your approved plans, and check with your municipality or a registered professional where the work is structural, electrical or needs approval. More short answers: Building Facts & Advice.