By HPM Bouhandelaars · Updated · 6 min read · Walls, concrete and paving

In short

  • 32.5 and 42.5 are strength classes; N and R tell you how fast the cement gains early strength.
  • 42.5 class cement is generally used for structural concrete; 32.5 class is common for mortar and plaster.
  • The mix printed on the bag, or your engineer's specification, always comes before any rule of thumb.
  • Use the right sand: concrete sand with stone for concrete, building sand for mortar, plaster sand for plaster.
  • Too much water and poor curing weaken a mix more than the choice of cement does. Keep new concrete damp for at least 7 days.

Every bag of cement carries a code such as "CEM II 32.5N" or "42.5R". It looks technical, but it answers two simple questions: how strong is this cement, and how quickly does it get there? This guide explains the code, which class suits which job, the proportions builders commonly work to, and the three things that decide whether a mix turns out strong: the sand, the water and the curing.

Reading the cement bag

  • CEM I, CEM II and so on describe what the cement is made of. CEM I is almost entirely Portland cement clinker. CEM II and higher types blend in other materials such as limestone, fly ash or slag. Most bagged general-purpose cement in South Africa is a blended type.
  • 32.5, 42.5, 52.5 is the strength class: the strength, in megapascals (MPa), that the cement reaches in a standard laboratory test after 28 days. A higher number means a stronger cement.
  • N or R is the early strength. N is normal; R is rapid, meaning the cement gains strength faster in the first few days. Both reach their class at 28 days.

The strength class describes the cement, not your concrete. The strength of what you cast depends on how much cement, sand, stone and water went into the mix and how it was cured.

Which cement for which job

  • Structural concrete - foundations, slabs, columns and beams: higher-strength cement (42.5 class, for example CEM II 42.5N) is generally used. Structural concrete must follow your engineer's specification.
  • Brickwork mortar and plaster: 32.5 class cement is commonly used. It gives a workable mix, and mortar and plaster do not need the strength of structural concrete.
  • Small general jobs - setting posts, a garden path, a small step: a general-purpose cement of either class works when it is mixed according to the bag.

Some cements are sold specifically for mortar and plaster and are not meant for concrete; the bag says so. If a bag carries a mix chart, use the proportions for that cement, because a stronger cement needs less cement in the mix than a weaker one for the same result.

Typical mix proportions

The proportions below are common South African site rules of thumb, measured by volume. They are a starting point for small, non-structural work only. The chart on the bag and your engineer's specification always take priority.

UseCementSandStone
Low-strength concrete (mass fill, footings for light garden walls)1about 4about 4
Medium-strength concrete (paths, floor slabs, light driveways)1about 3about 3
High-strength concrete (reinforced and heavy-duty work)1about 2about 2
Mortar for general brickwork1about 6none
Plaster1about 4 to 6none

A leaner mix (more sand per part of cement) is weaker and more porous; a richer mix is stronger but more likely to shrink and crack, which is why plaster should not be made much richer than the wall behind it needs.

Sand and stone matter as much as cement

Building sand, plaster sand and concrete sand are not the same thing. Building (brick) sand is used for mortar in brickwork. Plaster sand is finer and cleaner, for a smooth finish. River sand or crusher sand is used with stone in concrete. Using the wrong sand weakens the mix or causes cracking. Whatever the type, the sand must be clean: clay, soil, leaves and salt all weaken a mix. Do not use beach or dune sand, because the salt in it attacks reinforcing steel and draws damp into plaster. Concrete stone is commonly 19 mm, with smaller stone used for thin sections.

Batching, mixing and water

  • Measure every batch the same way. Use a bucket or a level wheelbarrow, not shovelfuls, which vary with the person and the material.
  • Mix dry first. Blend the cement and sand until the colour is even, then add the stone and the water.
  • Add water a little at a time. Use only enough clean water to make the mix workable. Extra water makes placing easier but leaves the hardened concrete weaker, more porous and more likely to crack. A mix that is sloppy enough to pour like soup is too wet.
  • Use it promptly. Place concrete, mortar and plaster soon after mixing, and do not revive a mix that has started to stiffen by adding water.
  • Protect yourself. Wet cement burns skin and cement dust is harmful to breathe. Wear gloves, eye protection and a dust mask, and wash splashes off straight away.

Curing

Cement hardens by reacting with water, not by drying out. If new concrete dries too fast, the reaction stops and the surface ends up weak and dusty. Keep concrete damp - covered with plastic sheeting or regularly sprayed - for at least the first 7 days, especially in hot or windy weather. Concrete reaches most of its design strength after about 28 days; check with your engineer before loading it heavily. Plaster benefits from the same care: dampen it lightly for a few days and keep the sun and wind off it where you can. New plaster then needs around four weeks in good weather before it is painted - see choosing exterior paint for coastal homes.

Storing cement

Cement starts to react as soon as it meets moisture, including damp air. Store bags indoors, off the floor on a pallet or planks, away from walls and tightly stacked, and use the oldest bags first. Buy what you will use in the next few weeks rather than stockpiling. A bag with hard lumps that do not crumble between your fingers has already begun to set and should not be used for anything that matters.

To work out how many bags a wall needs, see estimating bricks and cement for a wall or use the building calculators.

What you need

These links open the matching products in the HPM online store, with live prices (incl. VAT) and stock.

Questions and answers

Which cement should I use: 42.5 or 32.5?

Higher-strength cement (42.5 class, for example CEM II 42.5N) is generally used for structural concrete such as foundations, slabs and columns. 32.5 class cement is commonly used for brickwork mortar and plaster. Always follow the mix on the bag or your engineer's specification.

What do N and R mean on a cement bag?

They describe early strength. N is normal early strength and R is rapid early strength, which means the cement gains strength faster in the first few days. Both reach their strength class at 28 days in the standard test.

Is building sand the same as plaster sand?

No. Building (brick) sand is used for mortar in brickwork, plaster sand is finer and cleaner for a smooth plaster finish, and river sand or crusher sand is used with stone in concrete. Using the wrong sand weakens the mix or causes cracking.

How long must concrete cure before I load it?

Concrete keeps gaining strength for weeks. Keep it damp (covered or regularly sprayed) for at least the first 7 days, especially in hot or windy weather. It reaches most of its design strength after about 28 days - check with your engineer before heavy loading.

Can HPM deliver cement to my site?

Cement is a heavy item, so it is delivered by HPM's own trucks in the Western Cape (minimum 4 000 kg or R 10 000 per truck delivery outside Struisbaai) or collected from the store in Struisbaai. It does not go by courier.

Delivery from HPM

Parcels up to 50 kg are delivered by courier anywhere in South Africa, with the rate shown at checkout. Heavy building materials such as cement, bricks, sand, stone and timber are delivered by our own trucks in the Western Cape, and any order can be collected free in Struisbaai.

WhatsApp 076 370 4367 for a quote, call 028 435 6331 or email [email protected].

General guidance only. Products, sites and building rules differ - always follow the product data sheet and your approved plans, and check with your municipality or a registered professional where the work is structural, electrical or needs approval. More short answers: Building Facts & Advice.